Construction Of Two New Fire Facilities
Project Features
- The first building is a new 8,787 square foot metal building maintenance facility. The exterior of the building is concrete and metal panels and the interior is drywall, flooring, acoustical ceilings and painting.
- The second building is a new 4,864 square foot 3-story burn building which was constructed out of precast concrete wall and floor panels.
- The burn building is able to endure temperatures of 1500 degrees.